Home News & Post HuiSheng News
 
HuiSheng News
Successful Completion of Erection Work for a Steel Structure Workshop Extension
Input time: 2008/6/26
The erection of a steel structure workshop was successfully completed in June 2008 and will be soon put into use. This project is an extention of an existing building.To avoid potential problems and make a perfect interface of the existing and the new structure, we arranged the design engineers from our manufacturer for abroad-site inspection. All components and material for this project were shipped from Huangpu Port on Nov. 30th 2007, and erection of anchor bolts started on Feb. 2008, while structural erection started on late March 2008 and lasted for about two and a half months. During this period, our supervisor assigned by manufacturer played a significant role in monitoring, coordinating and guilding erecting work and obtained high praise from our clients.
 
<-Close->
   
   Copyright © 2007 HongKong HuiSheng Trading Ltd.